Product Details:
|
Name: | Double Girder Or Beam Cabin Control Electric Bridge Ladle Crane | Capacity: | 5-74t |
---|---|---|---|
Working Class: | A7 A8 | Temperature: | -10~60℃ |
Lifting Speed: | 9.8m/min,12.8m/min | Steel Track: | P43,P50,QU70 |
Power Source: | 380v50hz | Motor: | Heavy Duty Slipring Motor |
Control: | Cabin Control | Main Electrics: | Schneider |
Speed: | Customize | ||
High Light: | Double Girder Casting Ladle Crane,Double Beam Casting Ladle Crane,Cabin Control Casting Ladle Crane |
Double Girder Cabin Control Electric Bridge Ladle Crane
Product Introduction:
QDY Double girder cabin control electric bridge ladle crane is mainly used at the place where the molten metal is lifted, it is the main lifting and transportation equipment in the smelting workshop of the steel plant, and is used to lift and transfer and pour molten iron in the smelting process, the thermal—protective coating is added at the bottom of the main girder.
Lifting weight(t) | 5 | 10 | 16/3.2 | 20/5 | 32/5 | 50/10 | 74/20 | ||
Span(m) | 10.5~31.5 | ||||||||
Max Lifting height(m) | 16 | 16 | Main hook | 16 | 12 | 16 | 12 | 22 | |
Aux.hook | 18 | 14 | 18 | 16 | 24 | ||||
Working class | A7 | ||||||||
Speed | Hoisting | 15.5 | 10.4 | Main hook | 10.7 | 9.8 | 7.8 | 7.8 | 6.1 |
Aux.hook | 14.6 | 15.5 | 15.5 | 10.4 | 9.7 | ||||
Traveling | 37.2 | 43.8 | 44.6 | 44.6 | 42.4 | 33.8 | |||
Traveling | 92.7 | 92. 7 | 76 | 76 | 89 | 75 | 67.3 | ||
Motor | Hoisting | 15 | 22 | Main hook | 37 | 45 | 55 | 75 | 90 |
Aux.hook | 11 | 15 | 15 | 22 | 37 | ||||
Traveling | 1.5 | 2.2 | 3.7 | 3.7 | 7.5 | 11 | 15 | ||
Traveling | 2*5.5 | 2*5.5 | 2*7.5,2*11 | 2*7.5, 2*11 | 2*11 | 2*11, | 2*22 | ||
Steel track | trolley | 18kg/m | 24kg/m | 43kg/m | |||||
crane | 43kg/m | 43kg/m or QU70 | QU70 | QU80 | QU100 | ||||
Power source | 3Ph A.C 50Hz 380V |
Contact Person: John Jiao
Tel: +86 18937197716